REPORT AND ESTIMATE No. 8.
January 1864.
OF 1864.
166
No. 38.)
in Victoria my xc)
DATED
PARTICULARS.
LABOUR.
MATERIALS TO BE PURCHASED.
MATERIALS TO BE ISSUED FROM STORES.
PORTION OF WORK TO BE PERFORMED BY CONTRACT.
C. G. $ C.
carries forward
through the wall where it is July no drains exist in one district where the swell set in his from Seer House Street to Lower Bazaar, that I propose making this change; it will connect in the home the lower stones of the parapet and under course stone 12 inches thick with chamfered price and other stone which is 2ft by 7.8 as
This work in the stone now on, a4 a flight th by 27. th construction se brought forward parapet will be used a for paving.
by measurement soon the coping stone or services will be executed by contract.
The above of the lost itton on the case of t
For lineal ...
Casualties,...
TOTAL.
C. 7416
c. TOTAL...... 584
$8000
firestone Arm
Surveyor General.
REPORT AND ESTIMATE No.
8.
January
1864.
OF 1864.
166
No. 38.)
in Victoria my xc)
DATED
PARTICULARS.
LABOUR.
MATERIALS
TO BE
PURCHASED.
MATERIALS
TO BE ISSUED FROM STORES.
PORTION
OF WORK TO BE PERFORMED
BY CONTRACT.
C.
G.
$
C.
suffirms forward
}
through the wall where
it is
July
no drains exist
in one district where the swell set in his
from Seer House Striet to Lower Bazaar, that I propos
maki
this
change;
it will connect in the home the lower stones of the parapet and
under oe
urse
tone 12 inches
feton
thick with chamfered price and
otherstone which is 2ft by 7.8 as
This work in
the stone now on,
a4 a
flight th
by 27.
th
construction se
brought forward parapet will be used
a for paving.
by mea
measured soo
the coping stone or services will be executed by co
The above
of the lost itton
on
the case of t
For lineal
for
Casualties,...
T
TOTAL.
C.
7416
c.
TOTAL......
584
$8000
firestone Arm